
Name | Description | Value | Object Level |
FILL BATCH | Once urgent Samples / Lost are identified, the engine searches for any available Samples / Lots, regardless of their due time, to fill the batch and improve effectiveness. If NO, the engine will process only the urgent Samples / Lots | Y/N | System |
BATCH NUMBER SUFFIX | When Optima is asked to build a batch of Samples/ Lots, the Batch number includes date and time information in the preferred format | YYYY-MM-DD HH24:MI | System |
MAXIMUM BUFFER DAY FOR ... | This buffer day can be set for a specific date specified in your request form such as stability due date, due date, start date, etc. | Number ( days) | System |
NUMBER OF BUFFER DAYS | This buffer day can be set for a specific date as above and defined at Test Group level instead of system | Number ( days) | Test Group |
MAX BATCH SIZE | The Samples / Lots are grouped in a batch per test group. The number of Samples / Lots in a batch is limited to a maximum number. | Number | Test Group |
MIN BATCH SIZE | The Samples / Lots are grouped in a batch per test group. The number of Samples / Lots in a batch is limited to a minimum number. | Number | Test Group |
APPLY A GAP BETWEEN TESTS | The delay that is normally adjusted between steps is here applicable between Tests, so the first step of a Test can be delayed from the last step of the previous Test. | Number ( days) | Tests in a Test Series |
| MAX NUMBER OF STEP_NAME / DAY | Some activities like preparation step might be overwhelming. this parameter takes care to assign X number of this step to an employee per day | Number | Employee |
| MAXIMUM CONSECUTIVE HOURS | Maximum number of hours doing a specific Test_Name | Number ( hours) | Employee |
MULTIPLY BY SAMPLES | The duration of the step is set so that it can be multiplied by the number of Samples / Lots to be processed. The original formula associated to this parameter is : New Duration = N samples * Step duration For a more specific formula contact us. | Y/N | Step |
| MULTI INSTRUMENTS | This option can be activated directly at Instrument groups level. A formula would need to be facilitated in order to indicate when more than one instrument should be assigned such as N samples / 2 = number of instrument For a more specific formula contact us. | Y/N | Instruments Group |
| INFORMATION FROM REQUEST FORM | Some information provided in the Request Form is displayed in the Parameters column on the scheduling page, the Tasks List, and the My Tasks List. | TEXT | System |